Public Projects
Bids Due in 14 days
12/5/24 3:00pm
Sevierville, TN - Collier Drive Bridge Pump Station and Force Main (20240060.00.WK)
Bids Due in 14 days
WK Dickson & Co., Inc.
Sevierville, TN
The Work to be performed under this Contract shall consist of furnishing all labor, materials, tools, equipment, and incidentals and performing all Work required to construct complete, in place, and ready to operate the following: 1. One (1) Gorman Rupp AMT, above-ground, factory-built self-priming sewage pumping station package system with two (2) 15hp Gorman Rupp V-series self-priming pumps (Owner Supplied). 2. One (1) Vogelsang XRipper XRC100-320QD, rail system, and controls. 3. Approximately 689 LF of 6-inch PVC force main sewer.
Bids Due in 25 days
12/16/24 3:00pm
Belton-Honea Path (SC) Water Authority - WTP Filtration Improvements Phase 2 (2023086300CH)
Bids Due in 25 days
WK Dickson & Co., Inc.
Honea Path, SC
The work will consist of improvements to the existing filters at the 3.87 MGD water treatment plant
Bids Due in 25 days
12/16/24 2:00pm
Belton-Honea Path (SC) Water Authority - Water Treatment Plant Improvements Phase 1 (20230674.00.CH)
Bids Due in 25 days
WK Dickson & Co., Inc.
Honea Path, SC
The work will consist of construction of a new bulk chemical storage system, chemical building with feed equipment, and residuals lagoon dredging and effluent control structure improvements.
Bids Due in 21 days
12/12/24 2:00pm
Knoxville, TN - Burnett Creek Basin Sewer Rehabilitation (20220721.00.KV/PH05)
Bids Due in 21 days
WK Dickson & Co., Inc.
Knoxville, TN
Cleaning and CCTV of approximately 1,100 LF of 8-inch diameter sewer; 1,900 LF of 8-inch CIPP liner installation; 550 VF of manhole rehabilitation; replacement of 42 LF of 8-inch PVC gravity sewer main; and all associated services reconnections, erosion and sedimentation control, and appurtenances.
Bids Due in 14 days
12/5/24 2:00pm
Clinton, SC - Alleyway Utility Improvements (20240308.00.GV)
Bids Due in 14 days
WK Dickson & Co., Inc.
Clinton, SC
The work will consist of the construction of approximately 185 linear feet (LF) of new 6-inch water main, 170 LF of new 8-inch sanitary sewer main, 2 new manholes, 140 LF of new 6-inch sanitary sewer lateral, dry utilities realignment, and hardscape improvements along the alleys between Wall Street, North Broad Street, and Musgrove Street within the City of Clinton and SCDOT rights-of-way.
Bids Due tomorrow at 2:00pm
11/22/24 2:00pm
Wilmington (NC) International Airport (ILM) - Utility Expansion (20230828.00.WL)
Bids Due tomorrow at 2:00pm
WK Dickson & Co., Inc.
Wilmington, NC
Project scope shall generally consist of: Construction of new water and gravity sewer lines to expand existing utilities to the east side of ILM.
Bids Due in 4 days
11/25/24 10:00am
Folly Beach, SC - 10th Street Beach Access Dune Infiltration System (20230649.00.RA)
Bids Due in 4 days
WK Dickson & Co., Inc.
Folly Beach, SC
The proposed Work includes the installation of storm drainage infrastructure including but not limited to an inlet, 24” HDPE drainage pipe, pre-cast sand separator and stormwater pump station, 4” RJ PVC force main, and 4” perforated PVC pipe. In addition, the site will require traffic and erosion control measures. The project is located within the public beach access at 10th Street E and E Artic Ave in Folly Beach, South Carolina. All work shall occur on the landward side of the existing sea wall and within the public ROW. All work is proposed outside the SCDOT ROW.
Bidding Closed
10/25/24 2:00pm
Pikeville, NC - Wayne Executive Jetport - Parking Lot Drainage Improvements (20230667.00.RA)
Bidding Closed
WK Dickson & Co., Inc.
Pikeville, NC
Demolition of existing asphalt parking lot and replacement with new permeable pavement parking lot and drainage system. Includes installation of 3,460 SY of new permeable pavement.
Bidding Closed
11/14/24 2:00pm
REBID-Wilkes County, NC - Rural Community Wastewater Extension (20220842.00.CL)
Bidding Closed
WK Dickson & Co., Inc.
Wilkes County, NC
The Project includes the following Work: 1. Division 01 - Pump Station a. Construction of a 210-gpm duplex submersible wastewater pump station with associated 10-foot diameter wetwell. Work also includes associated electrical components, emergency generator, required site improvements, and access road. Located along Speedway Rd (SR-2355). 2. Division 02 - Gravity Sewer a. Construction of 4,800 LF of 8-inch gravity sewer located along Speedway Rd. (SR-2355) and across private property. 3. Division 03 - Force Main a. Construction of 4,110 LF of 6-inch force main located along Speedway Rd (SR-2355).
Bidding Closed
10/22/24 2:00pm
Lancaster, SC - WWTP Optimization and Flood Proofing (20220601.00.CL)
Bidding Closed
WK Dickson & Co., Inc.
Lancaster, SC
The proposed project will include replacing pumps at the existing influent pump station, adding a new covered sludge storage facility and truck unloading station, a new 16 inch RAS force main, a new SCADA system, an equalization basin mixing system, oxidation ditch improvements, and clarifier improvements. This is a rebid due the previous design being over budget.